|
Mar 29, 2024
|
|
|
|
BAE 530 - Natural Resource Engineering I Principles and measures for controlling storm water runoff and soil erosion including hydrology and surface water flow; design of water handling structures for land drainage, flood protection, and irrigation.
Credits: (3)
Note Three hours rec. a week.
Requisites Pr.: STAT 490; Pr. or conc.: ME 571. Not available for students with credit for CE 550.
When Offered II
KSIS Course Search
Add to Portfolio (opens a new window)
|
|