|
Jan 30, 2025
|
|
|
|
BAE 560 - Natural Resource Engineering I Principles and measures for controlling storm water runoff and soil erosion including hydrology and surface water flow; design of water handling structures for land drainage, flood protection, and irrigation.
Credits: (3)
Note: Three hours rec. a week.
Requisites: Pr.: STAT 490; Pr. or conc.: ME 571. Not available for students with credit for CE 550.
When Offered: Spring
KSIS Course Search
Add to Portfolio (opens a new window)
|
|